MEGA TUNNEL MACHINESÂ
Click Source Below to Leave Review
Synopsis:
In 24 hour shifts, three tunnels are being built in parallel in different directions on the so-called intermediate attack in Stuttgart Wangen. Mostly in blasting with 50 large machines from wheel loaders to drill trucks and lots of explosives. Since the workers are here directly under the city, vibrations on the surface must be avoided.